- Line Balancing
- Flow improvement in the offtrack area
- Optimisation of Supply Chain
- Design for Manufacturing, Assembly & Logistics
- Maintenance
-
Line Balancing
-
Increase productivity in assembly
-
Increase productivity in logistics
-
Logistics-automation
-
Implementation DC-Productionsystem
-
Training CIP-experts
-
Line Balancing
-
Implementation ZF-Productionsystem
-
Implementation CIP
-
Material management
- Development of a CIP incentive system
Site Solingen:
-
Interim Production Manager: Seat Rails, Seat Components, Recliners and Structures
- Implementation of a supplier portal
- SAP SD implementation
- Implementation of a new consignment stock process
- SAP SD/MM implementation
-
Installation of a lean logistics division
-
CIP Implementation
-
Training CIP-experts
-
Executive coaching and development
-
Value stream mapping
-
Implementation of SAP Full WM
-
Planning and Building of a logistics center
-
Installation of a lean logistics division
- CIP Implementation
- Executive coaching and development
- Value stream mapping
- CIP Implementation
-
Training CIP-experts
- CIP Implementation
-
Training CIP-experts
-
Implementation of a Productionsystem
- Executive coaching and development
- Outdoor Teamtraining
- Executive coaching and development
- Implementation of a new KPI system
Site Munich:
-
Concept, Implementing und Optimisation of Production Lines for Fabrication of 35 mm Film Cartridges
-
ISO 9001: Implementation to Maintenance and Production Lines
-
Initiation TPM and Maintenance Management
-
Concept, Implementing new Follow-On Composite Tool for 35 mm Film Cartridge Caps
-
Realisation Six-Sigma Projects for Cost Saving in Production (Material, Process) as Project Manager
Site Leverkusen:
-
Implemantation of KPI´s and inter-divisional Reporting
-
Specification for superior Production Software
- Upgrading Maintenance Management across locations with SAP PM
- Focusing corporate Spare Part Management within SAP MM
- Concept and Implementation of improvement of efficiency for Cost Reduction in Wafer Fabrication 1+2
- Ramp Up Wafer Fab 3 Production 7/24 with ca. 150 HC
- Specification and Procurement of a Direct Screen Printing Machine (DSP) for Cell Fabrication
- Design and Organisation of Production Expansion from 300 MW to 450 MW Solar Cells/a
-
Implementation paint to order
-
Process optimisation, cost analysis
-
Process optimisation roof interior pre-assembly
-
Parts presentation, worker training
-
Layout design for new production site
-
Introduction LEAN production system
-
Tact-time reduction Hypercar
-
Launch-integration new car model
-
Support layout new production system
- BMW sunroof assembly lines
- Initialize and implement measures to optimize product quality, within BMW PQM-System